Blog

E-SEVEN: Fast transfers start with good planning

A fast vessel can support a demanding logistics schedule, but speed is only one part of a successful crew transfer. Route planning, loading and the arrangements at each end of the journey remain essential.
E-SEVEN is a Fast Crew Supplier built in 2022. Measuring 22.10 metres in length, she is powered by twin Caterpillar C32 engines driving Hamilton waterjets. Her published speed is 32 knots.
Alongside passenger transport, E-SEVEN has a published deck cargo capacity of four tonnes. Her equipment also includes a firefighting monitor and night-vision equipment.
These features provide a useful basis for planning crew movements with accompanying equipment or supplies. The voyage plan must account for the actual load, operating conditions and transfer requirements; published speed is a specification, rather than a promise of journey time.
Within EMAR’s fleet, E-SEVEN offers a dedicated fast crew transport option. Her value lies in fitting the vessel’s capabilities into a practical schedule for the people and materials that need to move.
Explore E-SEVEN’s specifications