Blog

E-NINE: Where towing meets equipment handling

Some assignments require a tug to do more than maintain a pull. Handling towing gear and working equipment can be central to the job. E-NINE’s Shoalbuster configuration brings those activities together.
Built in 2010, E-NINE measures 35.25 metres in length and has a published bollard pull of 70 tonnes. Twin Caterpillar engines drive fixed-pitch propellers in nozzles, supported by a bow thruster for manoeuvring.
Her deck equipment includes an anchor-handling and towing winch, towing pins, a stern roller and a Heila deck crane. Each has a distinct role within the vessel’s working arrangement, from controlling the towline’s position to handling equipment over the stern.
The suitability of that equipment must be assessed against the loads and procedures for a specific task. Its presence provides capability; the operating plan determines how that capability is used.
E-NINE adds a practical deck-working dimension to EMAR’s towing fleet, combining pulling power with equipment that supports a broader range of marine tasks.
Explore E-NINE’s specifications